路沿石钢模具施工现场注意事项


沿石钢模具运输进入施工现场后,材料员必须对其进行验收。

After the stone steel mould along the road is transported to the construction site, the materialman must accept it.

要求路沿石钢模具无掉角、无断裂,表面完整,满足条件的路沿石钢模具方可投入使用。另外,叉车运输路沿石钢模具或人工搬运路沿石钢模具时要轻拿轻放,防止碰撞,减少损失。

It is required that the road edge stone steel mould shall be free of corner dropping, fracture and complete surface, and the road edge stone steel mould meeting the requirements can be put into use. In addition, forklift truck transport along the stone steel mold or manual handling road along the stone steel mold should be handled with care to prevent collision and reduce loss.

                  

路沿石钢模具基础的工程决定了路沿石的高低,因此,测量员测量放养时应该严格按照图纸的要求放样。否则,高程过高会导致路沿石无法满足设计要求,过低则会因水泥砂浆过厚引发路沿石下沉。同时,也要保证路沿石钢模具基础的顺直度,方便路沿石钢模具的安装。

The height of curbstone is determined by the engineering of steel mold foundation. Therefore, the surveyor should set out in strict accordance with the requirements of the drawing when surveying and stocking. Otherwise, if the elevation is too high, the curbstone will not meet the design requirements, and if the elevation is too low, the curbstone will sink due to the too thick cement mortar. At the same time, it is also necessary to ensure the smoothness and straightness of the stone steel mold foundation along the road, so as to facilitate the installation of the stone steel mold along the road.


路沿石钢模具基础施工时,人工支模一定要使路沿石基础的宽度合适。宽度过窄会使路沿石钢模具无法安装或者后期靠背过窄无法保护好路沿石;过宽会浪费材料。混凝土浇筑时要人工抹平,使其表面光滑,这样会使路沿石钢模具安装时较为方便。拆模要等到混凝土初凝后才可进行,要求小心,不可大意破坏路沿石基础。过早拆模会导致基础坍塌,过晚拆模会使拆模困难。

During the construction of the steel mold foundation along the road, the width of the stone foundation must be suitable for the manual support of the formwork. If the width is too narrow, the steel mold can not be installed or the back is too narrow to protect the curb; if the width is too wide, the material will be wasted. When pouring concrete, it should be manually trowelled to make its surface smooth, which will make it easier to install the stone steel mold along the road. Formwork removal can only be carried out after the initial setting of concrete. It is required to be careful not to damage the foundation of curbstone carelessly. Early form removal will lead to foundation collapse, and late form removal will make form removal difficult.